chart

STRUCTURAL DESIGN

CIVIL LAYOUT

STRUCTURAL DRAWING

Engineering Designing

Preparation of civil layout for RCC, Steel and Masonry Structures in different perspective such as isometric – view, elevation, plan – view etc. Preparation of structural drawings of members like foundation, shear wall, pavement, column, beam & slab that contains reinforcement details, cutting length, welding details, joint locations, clear cover etc. All designs are prepared as per governing standards that includes but not limited to IS 456: 2000, IS 800: 2007, IS 1893:1984, IS 4326:2013, IS 13828:1993, IS 13920:1993, IS 875:1987 and NBC 2016.

Architectural Designing

Crafting of architectural plans that contains a colourful illustration of civil layout in different perspectives such as elevation, isometric – view, plan – view etc. with few additional details of furniture, windows and doors. Besides, a 3D design is also modelled to cover all aesthetic aspects such as orientation & location of building components, colour & texture of building parts, interior furniture layout, outdoor landscape areas & tree cover.

Construction of Pre-Engineered Building   

Warehouse Structure

Pre-Engineered Building (PEB) Designing

Complete designing of Pre-engineering building includes soil testing, structural designing for foundations and super structure, selection of suitable lightweight members for super structure, estimation of quantity of construction material etc. Due consideration is given for seismic loads and wind loads acting on structures like Warehouses & Airport Hangars.

Civil & Structural designing involves following steps:

  1. Site testing of soil and data collection of terrain, topography.
  2. Preparation of preliminary plan of structure.
  3. Load calculation of structure with considering all forces such as self –weight, load of goods/ occupants, vibration load of machines (if any), wind load and earthquake load during the calculation.
  4. Selection of structural members i.e. columns, beams, slabs, foundation etc. such that all acting loads are safely transferred to the foundation.
  5. Detailing of structural drawings and civil layout and final architectural plan